Factory Supply Track Link Assembly Caterpillar Bulldozer - EXCAVATOR CATERPILLAR E320 TRACK LINK ASSY 878811 – Junhua
Factory Supply Track Link Assembly Caterpillar Bulldozer - EXCAVATOR CATERPILLAR E320 TRACK LINK ASSY 878811 – Junhua Detail:
Product Description
New undercarriage parts are sold individually but we suggest replacing all of your worn parts at the same time.
This is the aftermarket option for the Caterpillar E320 excavator track link assy. The track link assy is driven by the sprocket and final drive, provides support for the machine weight. And through our professional heat treatment, quenching and tempering, our track link could resist abrasion and impact well to meet your OEM/ODM or industry standard.
This track link assy is interchangeable with the following excavators:
• CATERPILLAR 317BL, 317BLN, 318BN, 318C, 320, 320B, 320C, 320N, E200B
• FLAT – KOBELCO/NEW HOLLAND E165LC, E175B
• KOBELCO SK170LC, SK200
Cross Reference (Original Codes)
| BERCO | CR5014/45, CR5350/45 |
| CATERPILLAR | 878811, 964301, 9W9354, |
| ITM | E01198A0Y00045, E01198A1M00045 |
| KOBELCO | YM62D00001F1 |
| VARIOUS | U10269/45 |
| VPI | VCR5350/45HDV |
Compatible Models
| CATERPILLAR | 317BL 6DZ -1-UP, 317BLN 9WW -1-UP, 318BN 7KZ -1-UP, 318BN AEJ -1-UP, 318C ADC-1-UP, 318C AEJ-1-UP, 318C BTG-1-UP, 318C FAA-1-UP, 320 2DL -1-UP, 320 3RK -1-UP, 320 3XM -1-UP, 320 7WK -1-UP, 320 8LK -1-UP, 320B 5BR -1-UP, 320C AKH -1-UP, 320C AMC -1-UP, 320C APA -1-UP, 320C BCB -1-UP, 320N 1XM -1-UP, 320N 9WG -1-UP, E200B 6KF1-UP |
| FIAT-KOBELCO/NEW HOLLAND | E165LC,E175B |
| KOBELCO | SK170LC DYNAMIC ACERA, SK170LC DYNAMIC ACERA |
Product detail pictures:
Related Product Guide:
We thinks what buyers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better high-quality, reduced processing costs, charges are more reasonable, won the new and outdated consumers the support and affirmation for Factory Supply Track Link Assembly Caterpillar Bulldozer - EXCAVATOR CATERPILLAR E320 TRACK LINK ASSY 878811 – Junhua, The product will supply to all over the world, such as: Mecca, Lebanon, Turkey, Meanwhile, we're building up and consummating triangle market & strategic cooperation in order to achieve a multi-win trade supply chain to expand our market vertically and horizontally for a brighter prospects. development. Our philosophy is to create cost-effective products, promote perfect services, cooperate for long-term and mutual benefits, firm a comprehensive mode of excellent suppliers system and marketing agents, brand strategic cooperation sales system.
The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.




